Requirement source freeze
Capture the final IPS, government response, safety-study page and relevant channel context with dates, URLs and hashes.
A fixed-scope evidence pre-screen for EU manufacturers, import advisers and UK channel teams: map one product line against the captured UK interim product specification, preserve missing model evidence, route laboratory questions and keep commencement and retailer acceptance explicit.
The deliverable is designed to make the next qualified review faster—not to replace it.
Capture the final IPS, government response, safety-study page and relevant channel context with dates, URLs and hashes.
Separate supplier claims, underlying documents, absent fields and questions that cannot be answered from a generic EU datasheet.
Route technical testing, commencement interpretation and retailer onboarding to the appropriate qualified owner before any sale claim.
“Hold” is an evidence-routing state, not a product failure verdict. The downloadable CSV preserves all 12 rows.
| Area | Official-source state | Fictional supplier evidence | Review state | Disposition |
|---|---|---|---|---|
| Product scope | Final IPS captured; solar only; batteries excluded | Composite brief says solar only | Fact and claim separated | Continue pre-screen |
| UK plug / PSSR route | S.I. 2026/848 comes into force 27 August 2026 | No model evidence | Date confirmed; product evidence missing | Hold |
| Inverter / export behaviour | Final IPS is the requirement source | Generic EU claim only | Lab verification required | Hold |
| EMC evidence | Representative safety study is context only | Declaration placeholder; report absent | Evidence missing | Hold |
| Mounting / fire evidence | Field extraction required from final IPS | Generic manual placeholder | Professional review required | Hold |
| Labels / consumer instructions | Clear consumer information flagged by government response | EU artwork/manual placeholders | UK mapping required | Draft gap map |
| Retailer acceptance | Retailer interest is context, not acceptance criteria | No onboarding pack | Channel requirements unknown | Hold |
| Commencement / enduring standard | 27 August 2026 statutory date confirmed | No enduring-standard or exact-model mapping | Product status remains unknown | Hold—no sale claim |
Three qualified manufacturers, import advisers or UK channel teams request model-specific matrices, or one £295 pre-screen is purchased after approved distribution.
Useful output requires engineering sign-off in the first step, equivalent pre-screening is already free, or ten approved high-specificity touches produce no qualified conversation.
Boundary: public-source and supplier-document readiness only. Not electrical engineering, product certification, legal advice, installation advice, retailer approval or a statement that any product can be sold, connected, installed or used in the UK. Formal determinations remain with qualified laboratories, standards professionals, advisers and relevant authorities. Not affiliated with or endorsed by the UK government, any retailer or Renewable Energy Institute.