Cooldown, then verify
Use a team-selected waiting window for normal version updates. Three days is a practical starting point, not a universal guarantee. Require CI, a change-surface note, and a named merge owner.
A founder-readable dependency release policy for small SaaS and agency teams: routine cooldowns, a separate security fast path, explicit overrides, test evidence, ownership, and rollback notes.
Use a team-selected waiting window for normal version updates. Three days is a practical starting point, not a universal guarantee. Require CI, a change-surface note, and a named merge owner.
Keep security updates separate from routine version bumps. Record applicability, urgency, compensating controls, tests, and the decision owner. “Fast” still needs evidence.
An urgent bug fix or blocked release may justify bypassing the normal cooldown. Capture why, who approved it, what was tested, and how to reverse the update.
Major versions, unmaintained packages, build/deploy tooling, auth/billing/data libraries, or unclear release notes deserve a human review rather than a timer-only decision.
Fictional/composite example. No real repository, package, incident, or customer is represented.
| Field | Sample entry | Why it matters |
|---|---|---|
| Update lane | Routine / security / override / manual | Prevents one rule from silently governing every dependency change. |
| Release timing | Published time + cooldown expiry | Makes the waiting rule observable instead of implied. |
| Change surface | Runtime, dev-only, build, deploy, auth, billing, data | Directs testing and human attention without pretending to calculate risk automatically. |
| Evidence | CI result, focused test, smoke check, release-note link | Shows what was actually checked before merge. |
| Owner + rollback | Named approver; pin/revert/deploy recovery note | Creates an accountable decision and a practical recovery path. |
Adapt this to the repository, package ecosystem, deployment model, support window, and team capacity. Written policy is not proof that controls are enforced.
A$149–299 Dependency Release Hygiene Review — one public repository or user-supplied redacted configuration, returned in 48–72 hours with an update-lane map, cooldown/override recommendations, evidence-card template, launch-critical dependency checklist, and repo-ready policy outline.
Free mini-review: one public dependabot.yml, Renovate config, package manifest, or documented update workflow, with 3–5 outside observations. No private-repo login, package upgrade, production change, vulnerability assessment, security/compliance certification, or guarantee that an update is safe.